2F63 2050 London Waterloo to Woking
Departing on 3rd January 2026

operated by
South Western Railway
8 coaches
450020
450080
GBTT
WTT
RTTRealtime
Route
Mi.Ch
Location
Pl
Arr
Dep
Arr
Dep
Arr
Dep
Dly
Path
Line
0.00
London Waterloo [WAT]
Pathed as Electric multiple unit at 75mph
2
2050
2050
2058¼
+8
DMS
0.40
pass
2051½
pass
2059¾
+8
1.29
8
2053
2054
2053
2054
2102
2102¾
+8
1.78
pass
2055
pass
2104
+8
2.50
pass
2056
pass
2104¾
+8
3.26
pass
2057
pass
2105¼
+8
3.74
11
2058
2059
2058
2059
2107
2107¾
+8
DMS
DS
5.46
3
2102
2102
2102
2102½
2110¾
2111½
+9
7.19
8
2106
2106
2105½
2106½
2114½
2115¼
+8
7.49
pass
2107½
pass
2116
+8
8.51
3
pass
2109
pass
2118¼
+9
9.62
4
pass
2110
pass
2119½
+9
SL
10.78
2
pass
2112
pass
2120¾
+8
12.03
3
2114
2115
2114
2115
2122
2122¾
+7
DS
DS
13.26
pass
2117
pass
2124¾
+7
14.30
4
2119
2119
2118½
2119
2126
2127¼
+8
15.72
2
2122
2122
2121½
2122
2129½
2130¼
+8
17.05
2
2124
2124
2124
2124½
2132¼
2133¼
+8
19.11
3
2128
2128
2127½
2128
2136
2136¾
+8
DS
DS
20.26
pass
2129½
No report
20.31
2
2130
2130
2130
2130½
2138¾
2139½
+9
DS
21.53
3
2133
2133
2133
2133½
2141¼
2142¾
+9
24.26
3
2138
2138
2147¾
+9
DS