2F65 2120 London Waterloo to Woking
Departing on 3rd January 2026

operated by
South Western Railway
8 coaches
450052
450017
GBTT
WTT
RTTRealtime
Route
Mi.Ch
Location
Pl
Arr
Dep
Arr
Dep
Arr
Dep
Dly
Path
Line
0.00
London Waterloo [WAT]
Pathed as Electric multiple unit at 75mph
3
2120
2120
2127
+7
DMS
0.40
pass
2121½
pass
2128¾
+7
1.29
8
2123
2124
2123
2124
2131
2132
+8
1.78
pass
2125
pass
2133
+8
2.50
pass
2126
pass
2133¾
+8
3.26
pass
2127
pass
2134½
+7
3.74
11
2128
2129
2128
2129
2136¼
2136¾
+7
DMS
DS
5.46
3
2132
2132
2132
2132½
2139¾
2140½
+8
7.19
8
2136
2136
2135½
2136½
2143½
2144¼
+7
7.49
pass
2137½
pass
2145¼
+7
8.51
3
pass
2139
pass
2146½
+7
9.62
4
pass
2140
pass
2147¾
+7
SL
10.78
2
pass
2142
pass
2148¾
+7
12.03
3
2144
2145
2144
2145
2150¼
2151
+6
DS
DS
13.26
pass
2147
pass
2152¾
+5
14.30
4
2149
2149
2148½
2149
2154¼
2156
+7
15.72
2
2152
2152
2151½
2152
2158
2159
+7
17.05
2
2154
2154
2154
2154½
2201
2202
+7
19.11
3
2158
2158
2157½
2158
2205
2205¾
+7
DS
DS
20.26
pass
2159½
No report
20.31
2
2200
2200
2200
2200½
2207½
2208¼
+7
DS
21.53
3
2203
2203
2203
2203½
2210
2211¾
+8
24.26
3
2208
2208
2217
+9
DS