2F71 2250 London Waterloo to Woking
Departing on 7th January 2026

operated by
South Western Railway
Arterio (10 coaches)
701033
GBTT
WTT
RTTRealtime
Route
Mi.Ch
Location
Pl
Arr
Dep
Arr
Dep
Arr
Dep
Dly
Path
Line
0.00
London Waterloo [WAT]
Pathed as Electric multiple unit at 75mph
1
2250
2250
2249½
DMS
0.40
pass
2251½
pass
2251
1.29
8
2253
2254
2253
2254
2252¾
2253½
1.78
pass
2255
pass
2254¾
2.50
pass
2256
pass
2255¼
3.26
pass
2257
pass
2256
3.74
11
2258
2259
2258
2259
2257½
2258
DMS
DS
5.46
3
2302
2302
2302
2302½
2301
2301¾
7.19
8
2306
2306
2305½
2306½
2305
2305¾
7.49
pass
2307½
pass
2306½
8.51
3
pass
2308½
pass
2307¾
9.62
4
pass
2309½
pass
2309
SL
10.78
2
pass
2311½
pass
2310¼
12.03
4
2314
2314
2313½
2314½
2312¾
2313½
DS
DS
13.26
pass
2316½
pass
2315¾
14.30
4
2318
2318
2318
2318½
2317¼
2318¼
15.72
2
2321
2321
2321
2321½
2320½
2321
17.05
2
2324
2324
2323½
2324
2323
2323¾
19.11
3
2327
2327
2327
2327½
2326½
2327
DS
DS
20.26
pass
2329
No report
20.31
2
2330
2330
2329½
2330
2329
2329½
DS
21.53
3
2333
2333
2332½
2333
2331¼
2332¾
24.26
Approaching
Woking [WOK]
1
2341
2341
2339¾
-1
DS