2F71 2250 London Waterloo to Woking
Departing on 12th January 2026

operated by
South Western Railway
Arterio (10 coaches)
701058
GBTT
WTT
RTTRealtime
Route
Mi.Ch
Location
Pl
Arr
Dep
Arr
Dep
Arr
Dep
Dly
Path
Line
0.00
London Waterloo [WAT]
Pathed as Electric multiple unit at 75mph
2
2250
2250
2249½
DMS
0.40
pass
2251½
pass
2251
1.29
8
2253
2254
2253
2254
2252¾
2253¾
1.78
pass
2255
pass
2255
2.50
pass
2256
pass
2255¾
3.26
pass
2257
pass
2256¼
3.74
11
2258
2259
2258
2259
2258
2258½
DMS
DS
5.46
3
2302
2302
2302
2302½
2301¼
2302
7.19
8
2306
2306
2305½
2306½
2304¾
2305¾
7.49
pass
2307½
pass
2306½
8.51
3
pass
2308½
pass
2307¾
9.62
4
pass
2309½
pass
2309
SL
10.78
2
pass
2311½
pass
2310½
12.03
4
2314
2314
2313½
2314½
2313¼
2314¼
DS
DS
13.26
pass
2316½
pass
2316½
14.30
4
2318
2318
2318
2318½
2318
2319¼
15.72
2
2321
2321
2321
2321½
2321½
2322
17.05
2
2324
2324
2323½
2324
2324
2324½
19.11
3
2327
2327
2327
2327½
2327¼
2327¾
DS
DS
20.26
pass
2329
No report
20.31
2
2330
2330
2329½
2330
2329½
2330¼
DS
21.53
3
2333
2333
2332½
2333
2331¾
2333½
24.26
Approaching
Woking [WOK]
4
2340
2340
2338
-1