2H78 2311 Shepperton to London Waterloo
Departing on 7th January 2026

operated by
South Western Railway
Arterio (10 coaches)
701013
GBTT
WTT
RTTRealtime
Route
Mi.Ch
Location
Pl
Arr
Dep
Arr
Dep
Arr
Dep
Dly
Path
Line
0.00
Shepperton [SHP]
Pathed as Electric multiple unit at 75mph
1
2311
2311
2310¾
US
1.39
1
2314
2314
2314
2314½
2313¾
2314¼
2.09
1
2316
2316
2316
2316½
2315¾
2316¼
2.45
1
2318
2318
2317½
2318
2317½
2318
4.26
1
2321
2321
2321
2321½
2320¾
2321
5.78
1
2324
2324
2324
2324½
2323¾
2324½
6.17
pass
2326
pass
2325
6.41
pass
2327
pass
2326
US
UK
7.16
2
2329
2329
2328½
2329
2328
2328½
8.26
1
2331
2331
2331
2331½
2330¾
2331¼
8.61
3
2333
2334
2333
2334½
2332¾
2333½
9.46
1
2336
2336
2336
2336½
2335¼
2335¾
11.08
1
2340
2340
2340
2340½
2338¾
2339½
UK
US
12.19
2
2343
2343
2342½
2343
2342½
2343
13.21
pass
2345
pass
2344¾
13.51
5
2346
2347
2346
2347
2346
2346½
US
14.42
pass
2349
pass
2348¾
15.24
2
pass
2350½
pass
2350¾
16.76
10
2354
2354
2353½
2354½
2354¼
2355
US
UMS
17.44
pass
2355½
pass
2356¼
18.20
pass
2356½
pass
2357
18.72
pass
2357½
pass
2358
19.41
7
2359
2359
2358½
2359½
2359½
0000
20.30
pass
0001½
pass
0001¾
20.70
2
0004
0004
0003¾
UMS