2S50 1603 Weybridge to London Waterloo
Departing on 7th January 2026

operated by
South Western Railway
Arterio (10 coaches)
701034
GBTT
WTT
RTTRealtime
Route
Mi.Ch
Location
Pl
Arr
Dep
Arr
Dep
Arr
Dep
Dly
Path
Line
0.00
Weybridge [WYB]
Pathed as Electric multiple unit at 100mph
1
1603
1603
1603
UC
0.60
pass
1605
pass
1605
1.63
2
1607
1607
1606½
1607
1606¾
1607½
3.17
2
1610
1610
1609½
1610½
1609¾
1610½
5.57
3
1615
1624
1615
1624
1614½
1623½
UC
UT
7.70
1
1627
1627
1627
1628
1627¾
1628½
9.70
1
1632
1633
1632
1633
1632½
1633¼
11.32
1
1636
1636
1635½
1636
1635½
1636
14.04
1
1640
1641
1640
1641
1639½
1640¾
15.37
pass
1643½
pass
1642¾
UT
UH
15.66
pass
1644½
pass
1644
16.45
1
1646
1647
1646
1647
1645
1646¾
17.75
1
1650
1650
1649½
1650
1649
1649¾
18.51
1
1652
1652
1651½
1652
1651
1651¾
19.33
1
1654
1654
1653½
1654½
1653¼
1654
20.04
pass
1655½
pass
1655¼
20.32
1
1657
1657
1656½
1657
1655¾
1656¾
20.51
pass
1657½
pass
1657
21.38
1
1659
1659
1659
1659½
1658¾
1659¼
22.31
1
1702
1702
1701½
1702
1701
1702
22.78
1
1705
1705
1704½
1705
1703½
1705
UH
UWS
24.13
1
1707
1708
1707
1708
1707
1707¾
25.25
4
1711
1711
1710½
1711
1709¾
1710¾
26.11
3
1713
1714
1713
1714
1712¼
1713½
26.68
pass
1716
pass
1715
UWS
UW
27.35
2
1717
1717
1716½
1717
1716
1717
UW
UW
28.07
pass
1718½
pass
1718
28.56
2
1720
1720
1719½
1720½
1719½
1720¼
29.45
pass
1723½
pass
1722¾
UW
30.05
19
1726
1726
1725½
UW