5C94 2047 Woking to London Waterloo
Departing on 9th January 2026

operated by
South Western Railway
4 coaches
450067
WTT
RTTRealtime
Route
Mi.Ch
Location
Pl
Arr
Dep
Arr
Dep
Dly
Path
Line
0.00
Woking [WOK]
Pathed as Electric multiple unit at 100mph
5
2047
2047
US
2.53
1
pass
2050½
pass
2050¼
3.75
1
pass
2052
pass
2052¼
US
UBC
4.09
pass
2052½
No report
4.78
pass
2053½
pass
2053¾
UBC
UC
6.01
2
pass
2055
pass
2055
7.35
2
pass
2057½
pass
2057
9.75
Virginia Water [VIR]
Service stops for pathing (passing train)
3
2102½
2105
2101¾
2102½
-2
UC
UT
12.08
1
pass
2110½
pass
2106
-4
14.08
1
pass
2115½
pass
2113¾
-1
15.50
1
pass
2118½
pass
2115½
-2
18.22
1
pass
2124
pass
2118¼
-5
19.55
pass
2125½
pass
2119¾
-5
20.07
pass
2126
pass
2120¼
-5
20.47
1
pass
2126½
pass
2121½
-4
21.41
pass
2127½
pass
2123¾
-3
FL
21.68
4
pass
2128
pass
2124¼
-3
22.24
2
pass
2128½
pass
2125¼
-3
23.33
2
pass
2130½
pass
2129½
UT
UR
24.07
1
pass
2131½
pass
2131
24.69
1
pass
2132½
pass
2132
26.03
2
pass
2134
pass
2133½
UR
UWF
27.18
2
pass
2137
pass
2135½
-1
28.30
3
pass
2139½
pass
2137½
-1
29.16
4
pass
2141½
pass
2141
UWF
UWF
29.73
pass
2143
pass
2142½
UWF
UW
30.40
2
pass
2144
pass
2144
UW
UW
31.12
pass
2145½
pass
2145
31.61
2
pass
2147
pass
2147¼
32.50
pass
2149
pass
2149¾
UW
UMR
33.10
13
2154
2152¼
-1
UMR