5C99 2145 London Waterloo to Woking
Departing on 8th January 2026

operated by
South Western Railway
4 coaches
450095
WTT
RTTRealtime
Route
Mi.Ch
Location
Pl
Arr
Dep
Arr
Dep
Dly
Path
Line
0.00
London Waterloo [WAT]
Pathed as Electric multiple unit at 100mph
16
2145
2142¾
-2
DW
0.40
pass
2146½
pass
2144¼
-2
DW
DWF
1.29
3
pass
2148
pass
2145¾
-2
1.78
pass
2149
pass
2146½
-2
DWF
DW
2.50
3
pass
2150
pass
2147½
-2
DW
DWS
3.17
pass
2151
pass
2148
-2
3.74
6
pass
2152
pass
2149¼
-2
DWS
DWS
4.60
1
pass
2153
pass
2150¾
-2
5.72
4
pass
2154½
pass
2151¾
-2
7.07
4
pass
2156
pass
2153¼
-2
DWS
DR
8.21
2
pass
2158
pass
2155¾
-2
9.03
2
pass
2159½
pass
2158
-1
9.57
1
pass
2201
pass
2200¼
DR
DT
10.66
3
pass
2204½
pass
2203¼
-1
11.22
5
pass
2206
pass
2205¼
11.49
pass
2206½
pass
2205¾
12.43
2
pass
2207
pass
2207
13.03
pass
2207½
pass
2207½
13.35
pass
2208
pass
2207¾
14.68
2
pass
2212
pass
2209¾
-2
17.40
2
pass
2217
pass
2213¾
-3
19.02
2
pass
2220
pass
2218½
-1
21.02
2
pass
2224
pass
2223½
23.15
Virginia Water [VIR]
Service stops for pathing (passing train)
4
2229
2231½
pass
2229¼
-2
DT
DC
25.55
1
pass
2235½
pass
2234¼
-1
27.09
1
pass
2238
pass
2237
-1
28.12
pass
2240
pass
2238¼
-1
DC
DBC
29.11
pass
2242
No report
29.16
2
pass
2242
pass
2241
DBC
DS
30.38
3
pass
2243½
pass
2244
33.11
Approaching
Woking [WOK]
5
2247
2249½
+2