5D03 0500 Wimbledon Park Depot Sdgs to London Waterloo
Departing on 6th January 2026

operated by
South Western Railway
Arterio (10 coaches)
701058
WTT
RTTRealtime
Route
Mi.Ch
Location
Pl
Arr
Dep
Arr
Dep
Dly
Path
Line
0.00
Wimbledon Park Depot Sdgs
Pathed as Electric multiple unit at 75mph
0500
0459
-1
EFD
0.00
0505
0505
N/R
0500
-5
UF
0.58
pass
0506½
pass
0503¾
-2
2.30
8
pass
0509½
pass
0506
-3
UF
UMF
2.78
pass
0510½
pass
0507
-3
3.54
pass
0511
pass
0507¾
-3
4.26
pass
0512
pass
0508¼
-3
4.75
5
pass
0513
pass
0509¾
-3
5.64
pass
0514
pass
0511¼
-2
6.24
6
0516
0513
-3