5D03 0500 Wimbledon Park Depot Sdgs to London Waterloo
Departing on 7th January 2026

operated by
South Western Railway
Arterio (10 coaches)
701020
WTT
RTTRealtime
Route
Mi.Ch
Location
Pl
Arr
Dep
Arr
Dep
Dly
Path
Line
0.00
Wimbledon Park Depot Sdgs
Pathed as Electric multiple unit at 75mph
0500
0458
-2
EFD
0.00
0505
0505
N/R
0459
-6
UF
0.58
pass
0506½
pass
0503
-3
2.30
8
pass
0509½
pass
0506¾
-2
UF
UMF
2.78
pass
0510½
pass
0508½
-1
3.54
pass
0511
pass
0509¼
-1
4.26
pass
0512
pass
0510
-1
4.75
5
pass
0513
pass
0511¼
-1
5.64
pass
0514
pass
0512¼
-1
6.24
6
0516
0514
-2