5D03 0500 Wimbledon Park Depot Sdgs to London Waterloo
Departing on 9th January 2026

operated by
South Western Railway
Arterio (10 coaches)
701043
WTT
RTTRealtime
Route
Mi.Ch
Location
Pl
Arr
Dep
Arr
Dep
Dly
Path
Line
0.00
Wimbledon Park Depot Sdgs
Pathed as Electric multiple unit at 75mph
0500
0454
-6
EFD
0.00
0505
0505
N/R
0456
-9
UF
0.58
pass
0506½
pass
0459
-7
2.30
8
pass
0509½
pass
0501½
-7
UF
UMF
2.78
pass
0510½
pass
0502½
-7
3.54
pass
0511
pass
0503¼
-7
4.26
pass
0512
pass
0504
-8
4.75
5
pass
0513
pass
0505¼
-7
5.64
pass
0514
pass
0506¼
-7
6.24
6
0516
0508
-8