5D05 0520 Wimbledon Park Depot Sdgs to London Waterloo
Departing on 5th January 2026

operated by
South Western Railway
Arterio (10 coaches)
701020
WTT
RTTRealtime
Route
Mi.Ch
Location
Pl
Arr
Dep
Arr
Dep
Dly
Path
Line
0.00
Wimbledon Park Depot Sdgs
Pathed as Electric multiple unit at 75mph
0520
0521
+1
EFD
0.00
0525
0525
N/R
0523
-2
UF
0.58
pass
0526½
pass
0526½
2.30
8
pass
0529½
pass
0529½
UF
UMF
2.78
pass
0531
pass
0530¾
3.54
pass
0533
pass
0531½
-1
4.26
pass
0534½
pass
0532¼
-2
4.75
5
pass
0536
pass
0533¾
-2
UMF
UMS
5.64
pass
0537½
pass
0536
-1
6.24
2
0542½
0538
-4
UMS