5D05 0520 Wimbledon Park Depot Sdgs to London Waterloo
Departing on 6th January 2026

operated by
South Western Railway
Arterio (10 coaches)
701018
WTT
RTTRealtime
Route
Mi.Ch
Location
Pl
Arr
Dep
Arr
Dep
Dly
Path
Line
0.00
Wimbledon Park Depot Sdgs
Pathed as Electric multiple unit at 75mph
0520
0518
-2
EFD
0.00
0525
0525
No report
FL
0.58
pass
0526½
pass
0521¼
-5
2.30
8
pass
0529½
pass
0526¼
-3
UF
UMF
2.78
pass
0531
pass
0528¾
-2
3.54
pass
0533
pass
0529½
-3
4.26
pass
0534½
pass
0530¼
-4
4.75
5
pass
0536
pass
0533¼
-2
UMF
UMS
5.64
pass
0537½
pass
0537
6.24
2
0542½
0539
-3
UMS