5D05 0520 Wimbledon Park Depot Sdgs to London Waterloo
Departing on 7th January 2026

operated by
South Western Railway
Arterio (10 coaches)
701048
WTT
RTTRealtime
Route
Mi.Ch
Location
Pl
Arr
Dep
Arr
Dep
Dly
Path
Line
0.00
Wimbledon Park Depot Sdgs
Pathed as Electric multiple unit at 75mph
0520
0520
EFD
0.00
0525
0525
N/R
0524
-1
UF
0.58
pass
0526½
pass
0526¾
2.30
8
pass
0529½
pass
0529¼
UF
UMF
2.78
pass
0531
pass
0530
3.54
pass
0533
pass
0531
-1
4.26
pass
0534½
pass
0531½
-2
4.75
5
pass
0536
pass
0535¾
UMF
UMS
5.64
pass
0537½
pass
0538¾
+1
6.24
2
0542½
0540¾
-1
UMS