5D05 0520 Wimbledon Park Depot Sdgs to London Waterloo
Departing on 8th January 2026

operated by
South Western Railway
Arterio (10 coaches)
701017
WTT
RTTRealtime
Route
Mi.Ch
Location
Pl
Arr
Dep
Arr
Dep
Dly
Path
Line
0.00
Wimbledon Park Depot Sdgs
Pathed as Electric multiple unit at 75mph
0520
0520
EFD
0.00
0525
0525
N/R
0608
+43
UF
0.58
pass
0526½
pass
0613
+46
2.30
8
pass
0529½
pass
0616
+46
UF
UMF
2.78
pass
0531
pass
0617
+46
3.54
pass
0533
pass
0618
+45
4.26
pass
0534½
pass
0618¾
+44
4.75
5
pass
0536
pass
0620¾
+44
MSL
5.64
pass
0537½
pass
0623¾
+46
6.24
6
0542½
0627
+44