5O53 1712 Wimbledon Park Depot Sdgs to London Waterloo
Departing on 7th January 2026

operated by
South Western Railway
Arterio (10 coaches)
701025
WTT
RTTRealtime
Route
Mi.Ch
Location
Pl
Arr
Dep
Arr
Dep
Dly
Path
Line
0.00
Wimbledon Park Depot Sdgs
Pathed as Electric multiple unit at 75mph
1712
1706
-6
EFD
0.00
1717
1717
N/R
1719
+2
UF
0.58
pass
1718½
pass
1723
+4
2.30
8
pass
1721½
pass
1725¼
+3
UF
UMF
2.78
pass
1722½
pass
1726
+3
3.54
pass
1723
pass
1726¾
+3
4.26
pass
1724
pass
1727½
+3
4.75
5
pass
1725
pass
1728¾
+3
5.64
pass
1726
pass
1730¼
+4
UMF
UW
6.24
18
1728
1732½
+4
UW