5O53 1712 Wimbledon Park Depot Sdgs to London Waterloo
Departing on 9th January 2026

operated by
South Western Railway
Arterio (10 coaches)
701044
WTT
RTTRealtime
Route
Mi.Ch
Location
Pl
Arr
Dep
Arr
Dep
Dly
Path
Line
0.00
Wimbledon Park Depot Sdgs
Pathed as Electric multiple unit at 75mph
1712
1709
-3
EFD
0.00
1717
1717
N/R
1718
+1
UF
0.58
pass
1718½
pass
1721¾
+3
2.30
8
pass
1721½
pass
1724½
+3
UF
UMF
2.78
pass
1722½
pass
1725¼
+2
3.54
pass
1723
pass
1726
+2
4.26
pass
1724
pass
1726¾
+2
4.75
5
pass
1725
pass
1728¼
+3
5.64
pass
1726
pass
1732¾
+6
UMF
UW
6.24
18
1728
1735
+7
UW