5Y87 1022 London Waterloo to Wimbledon Park Depot Sdgs
Departing on 5th January 2026

operated by
South Western Railway
Arterio (10 coaches)
701012
WTT
RTTRealtime
Route
Mi.Ch
Location
Pl
Arr
Dep
Arr
Dep
Dly
Path
Line
0.00
London Waterloo [WAT]
Pathed as Electric multiple unit at 75mph
17
1022
1021
DW
0.40
pass
1023½
pass
1022¾
DW
DWS
1.29
4
pass
1025
pass
1025¼
1.78
pass
1026
pass
1027
+1
DWS
DW
2.50
3
pass
1027
pass
1028
+1
DW
DWS
3.17
pass
1028½
pass
1028¾
3.74
6
pass
1030½
pass
1031
DWS
DWS
4.60
1
pass
1032
pass
1034
+1
DWS
EPR
5.09
1
pass
1033
pass
1034
+1
DR
5.60
East Putney [ZPU]
Service stops for pathing (passing train)
1035
1038
1038
1035
-2
6.58
pass
1040½
No report
7.50
2
pass
1042½
pass
1049½
+7
DD
8.24
1044
1044
No report
EP