5Y87 1022 London Waterloo to Wimbledon Park Depot Sdgs
Departing on 8th January 2026

operated by
South Western Railway
Arterio (10 coaches)
701054
WTT
RTTRealtime
Route
Mi.Ch
Location
Pl
Arr
Dep
Arr
Dep
Dly
Path
Line
0.00
London Waterloo [WAT]
Pathed as Electric multiple unit at 75mph
17
1022
1019¾
-2
DW
0.40
pass
1023½
pass
1021¼
-2
DW
DWS
1.29
4
pass
1025
pass
1024¾
1.78
pass
1026
pass
1026¼
DWS
DW
2.50
3
pass
1027
pass
1027¼
DW
DWS
3.17
pass
1028½
pass
1028
3.74
6
pass
1030½
pass
1030¼
DWS
DWS
4.60
1
pass
1032
pass
1032¼
DWS
EPR
5.09
1
pass
1033
pass
1032
-1
DR
5.60
East Putney [ZPU]
Service stops for pathing (passing train)
1035
1038
1034
1032½
-5
6.58
pass
1040½
No report
7.50
2
pass
1042½
pass
1040½
-2
DD
8.24
1044
1044
1041
1041
EP