5Y88 1057 London Waterloo to Wimbledon Park Depot Sdgs
Departing on 9th January 2026

operated by
South Western Railway
Arterio (10 coaches)
701009
WTT
RTTRealtime
Route
Mi.Ch
Location
Pl
Arr
Dep
Arr
Dep
Dly
Path
Line
0.00
London Waterloo [WAT]
Pathed as Electric multiple unit at 75mph
20
1057
1059
+2
WR1
0.40
pass
1058½
pass
1100
+1
WR1
DWF
1.29
3
pass
1100½
pass
1102½
+2
1.78
pass
1101½
pass
1103¼
+1
DWF
DW
2.50
3
pass
1102½
pass
1104½
+2
DW
DWF
3.17
pass
1103½
pass
1105¼
+1
3.74
5
pass
1104½
pass
1106¼
+1
4.60
2
pass
1106
pass
1107½
+1
DWS
EPR
5.09
2
pass
1107
pass
1107
DR
5.60
pass
1109
pass
1111½
+2
6.58
pass
1111½
No report
7.50
2
pass
1113½
pass
1117½
+4
DD
8.24
1115
1115
No report
EP