5Y93 2327 London Waterloo to Wimbledon Park Depot Sdgs
Departing on 9th January 2026

operated by
South Western Railway
Arterio (10 coaches)
701039
WTT
RTTRealtime
Route
Mi.Ch
Location
Pl
Arr
Dep
Arr
Dep
Dly
Path
Line
0.00
London Waterloo [WAT]
Pathed as Electric multiple unit at 75mph
23
2327
2327½
WR1
0.40
pass
2328½
pass
2328¾
WR1
DWF
1.29
3
pass
2329½
pass
2330½
+1
1.78
pass
2330½
pass
2331½
+1
DWF
DW
2.50
3
pass
2331½
pass
2332½
+1
DW
DWS
3.17
pass
2332½
pass
2333
3.74
6
pass
2333½
pass
2334½
+1
DWS
DWS
4.60
1
pass
2335
pass
2336¼
+1
DWS
EPR
5.09
1
pass
2336
pass
2336
DR
5.60
East Putney [ZPU]
½
Service stops for pathing (passing train)
2338
2342
2338
2336½
-5
6.58
pass
2345
No report
7.50
2
pass
2347
pass
2344½
-2
DD
8.24
2349
2349
2346
2346
EP