2W50 1600 Ashford International to London Charing CrossDeparting on 12th January 2026
operated by
Southeastern
This service is partially cancelled
This service was cancelled between Dover Priory and Ashford International due to a problem with the traction equipment (MB).
GBTT
WTT
Realtime
Route
Mi.Ch
Location
Pl
Arr
Dep
Arr
Dep
Arr
Dep
Dly
Path
Line
0.00
Dover Priory [DVP]
Pathed as Electric multiple unit at 100mph
forms from 2R36 from London Charing Cross
1525
1525
-