5Y60 0907 Grove Park Down C.H.S. to Tonbridge
Departing on 6th January 2026

operated by
Southeastern
4 coaches
375609
WTT
RTTRealtime
Route
Mi.Ch
Location
Pl
Arr
Dep
Arr
Dep
Dly
Path
Line
0.00
Grove Park Down C.H.S.
Pathed as Electric multiple unit at 75mph
0907
0910½
+3
0.35
0912
0912
0914½
0914¾
+2
CHS
DS
0.78
5
pass
0915½
pass
0917
+1
SL
2.21
4
pass
0918½
pass
0919¼
+1
3.19
4
pass
0920½
pass
0920¾
DS
RCL
4.10
pass
0922
pass
0922½
RCL
DCF
5.50
2
pass
0924
pass
0924½
8.24
2
pass
0927
pass
0927¾
DCF
DMD
11.25
2
pass
0931
pass
0931½
13.45
2
pass
0934
pass
0934
14.79
2
pass
0936
pass
0935¾
15.46
pass
0937
pass
0937
DMD
DBB
16.44
2
pass
0939½
pass
0938¼
-1
17.62
3
pass
0942½
pass
0942½
DBB
DM
22.55
2
pass
0948½
pass
0950¼
+1
25.19
4
0952
1000
+8
DM