1H80 2150 Hastings to London Bridge
Departing on 8th January 2026

operated by
Southeastern

This service is partially cancelled

This service was cancelled between London Bridge and London Charing Cross due to a problem with the train (M8).

GBTT
WTT
RTTRealtime
Route
Mi.Ch
Location
Pl
Arr
Dep
Arr
Dep
Arr
Dep
Dly
Path
Line
0.00
Hastings [HGS]
Pathed as Electric multiple unit at 100mph
3
2150
2150
2215¼
+25
UH
0.58
1
2153
2153
2152½
2153½
2217½
2218¼
+24
1.44
pass
2155½
pass
2221
+25
UH
1.54
1
2156
2157
2156
2157
2221½
2222½
+25
4.63
1
2202
2202
2202
2202½
2227
2228¼
+25
6.67
1
2206
2207
2206
2207
2231½
2232¼
+25
10.55
pass
2211
pass
2237¾
+26
12.66
1
2214
2214
2214
2214½
2240¾
2242
+27
14.79
1
2218
2218
2217½
2218½
2244¾
2245½
+27
18.47
1
2223
2223
2223
2223½
2249¾
2250¼
+26
21.73
pass
2227½
pass
2255¼
+27
23.10
1
2229
2230
2229
2230
2256¾
2257¾
+27
25.60
1
2234
2234
2233½
2234
2301¼
2302
+28
27.14
pass
2236½
pass
2304
+27
28.01
2
2239
2240
2238½
2240
2305¾
2307
+27
UH
DH
28.57
pass
2241
pass
2308
+27
DH
UH
29.43
1
2243
2243
2243
2243½
2310
2310½
+27
32.10
pass
2248
pass
2313½
+25
32.71
2
2250
2251
2250
2251
2315¾
2316¾
+25
UH
UM
35.35
1
pass
2254
pass
2320
+26
40.28
1
2259
2300
2259
2300
2324¾
2325¾
+25
UM
UM
41.71
1
pass
2301½
pass
2327¾
+26
45.73
1
pass
2305
pass
2331
+26
47.12
1
pass
2306
pass
2332
+26
48.52
2
2308
2308
2307½
2308½
2333¾
2334¾
+26
UM
UF
49.64
1
pass
2310
pass
2336¼
+26
50.13
pass
2310½
pass
2336¾
+26
51.18
1
pass
2311½
pass
2337¾
+26
52.16
1
pass
2312½
pass
2338¾
+26
53.39
2
pass
2313½
pass
2339¾
+26
UF
UF
54.73
pass
2314½
pass
2340¾
+26
55.21
1
pass
2315
pass
2341½
+26
56.01
pass
2316½
pass
2342¾
+26
FL
UKF
56.70
pass
2317½
pass
2344
+26
57.08
pass
2317½
pass
2344¼
+26
57.49
pass
2318½
pass
2345¼
+26
UF
UKF
59.05
pass
2320½
pass
2347¼
+26
UKF
7
59.46
pass
2321
pass
2347½
+26
59.75
pass
2321½
pass
2348¼
+26
60.20
pass
2322
No report
60.48
7
2323
2325
2323
2325
2351¼
+28
61.06
pass
2326½
-
61.14
pass
2327
-
61.56
2329
2330
2329
2330
-