1H80 2150 Hastings to London BridgeDeparting on 8th January 2026
operated by
Southeastern
This service is partially cancelled
This service was cancelled between London Bridge and London Charing Cross due to a problem with the train (M8).
GBTT
WTT
Realtime
Route
Mi.Ch
Location
Pl
Arr
Dep
Arr
Dep
Arr
Dep
Dly
Path
Line
0.00
3
2150
2150
2215¼
+25
UH