2E05 0509 London Bridge to Dartford
Departing on 5th January 2026

operated by
Southeastern

This service is cancelled.

This service was cancelled due to a problem with the train (M8).

GBTT
WTT
RTTRealtime
Route
Mi.Ch
Location
Pl
Arr
Dep
Arr
Dep
Arr
Dep
Dly
Path
Line
0.00
0509
0509
-
0.53
pass
0510½
-
1.02
pass
0511
-
1.43
pass
0511½
-
2.06
pass
0512½
-
3.07
0515
0515
0514½
0515
-
3.47
0517
0517
0516½
0517½
-
4.38
0520
0520
0520
0520½
-
5.07
0522
0522
0522
0522½
-
5.46
pass
0524
-
5.55
0525
0525
0524½
0525½
-
6.67
0529
0529
0528½
0529
-
7.43
0531
0532
0531
0532
-
8.12
0534
0534
0533½
0534
-
9.54
0537
0538
0537
0538
-
11.06
0541
0541
0540½
0541
-
12.29
0544
0544
0543½
0544
-
13.41
0547
0547
0546½
0547½
-
13.77
pass
0548½
-
14.53
pass
0549½
-
15.15
pass
0550
-