2N03 0529 London Bridge to Gravesend
Departing on 6th January 2026

operated by
Southeastern
GBTT
WTT
RTTRealtime
Route
Mi.Ch
Location
Pl
Arr
Dep
Arr
Dep
Arr
Dep
Dly
Path
Line
0.00
London Bridge [LBG]
Pathed as Electric multiple unit at 75mph
2
0529
0529
0529
1
0.28
pass
0530
pass
0529¾
0.53
pass
0530½
pass
0530½
1.02
pass
0531
pass
0530¾
1.43
pass
0531½
pass
0531
2.06
pass
0532
pass
0532¼
2.36
pass
0532½
pass
0532½
2.79
C
pass
0533½
pass
0533¾
1
DS
3.40
pass
0534
pass
0534½
3.58
2
pass
0534½
pass
0534½
DS
DNK
4.15
2
0536
0537
0536
0537
0536
0537
DNK
DMK
4.32
pass
0538
pass
0537¾
DMK
DCH
4.54
pass
0538½
pass
0538½
DCH
DS
5.34
6
0541
0542
0541
0542
0540¾
0541¾
DS
DDL
5.63
pass
0543
pass
0542¾
6.04
2
0544
0544
0543½
0544
0543½
0544½
7.58
2
0547
0547
0547
0547½
0547½
0548
8.50
2
0550
0550
0549½
0550½
0550¼
0551¼
10.11
2
0553
0554
0553
0554
0553¾
0554½
DDL
DDL
11.06
2
0556
0556
0556
0556½
0556¼
0557¼
12.07
2
0559
0559
0558½
0559
0559¼
0600½
+1
13.43
2
0602
0602
0601½
0602½
0603
0603¾
+1
14.29
pass
0603½
pass
0605¾
+2
14.61
pass
0604½
pass
0609½
+5
DDL
DM
15.20
4
0606
0607
0606
0607½
0611¾
0613¼
+5
DM
DNK
17.15
2
0612
0612
0611½
0612
0617¼
0617¾
+5
17.77
2
0614
0615
0614
0615
0619½
0620
+5
19.22
2
0618
0618
0617½
0618
0622½
0623
+5
19.56
pass
0619
No report
19.77
2
0620
0620
0619½
0620
0624½
0625¼
+5
20.50
pass
0621
pass
0626½
+5
22.03
0
0625
0625
0630¼
+5
DNK