1U20 1138 London Bridge to Maidstone East
Departing on 7th January 2026

operated by
Southeastern
4 coaches
377515

This service is partially cancelled

This service was cancelled between London Charing Cross and London Bridge due to a problem with the infrastructure caused by adverse weather conditions (OG).

GBTT
WTT
RTTRealtime
Route
Mi.Ch
Location
Pl
Arr
Dep
Arr
Dep
Arr
Dep
Dly
Path
Line
0.00
London Charing Cross [CHX]
Pathed as Electric multiple unit at 100mph
1129
1129
-
0.61
1132
1132
1131½
1132½
-
1.23
pass
1134
-
1.31
pass
1134½
-
1.69
9
1136
1138
1136
1138
1144½
+6
7
2.17
pass
1139
pass
1145¼
+6
2.42
pass
1139
pass
1145¾
+6
2.71
pass
1139½
pass
1146
+6
3.32
pass
1140
pass
1146½
+6
7
DKF
4.68
pass
1143
pass
1148½
+5
DKF
DF
5.29
pass
1144
pass
1149½
+5
5.47
pass
1144
pass
1150
+5
6.36
pass
1145
pass
1150¾
+5
DKF
DKF
7.16
2
pass
1146½
pass
1152¾
+6
FL
7.44
pass
1147
pass
1152¾
+5
8.78
5
pass
1149
pass
1155½
+6
FL
SL
10.21
4
pass
1150½
pass
1157
+6
11.19
4
pass
1151½
pass
1157½
+6
DS
RCL
12.10
pass
1153
pass
1200¼
+7
RCL
DCF
13.50
2
pass
1155
pass
1201¾
+7
16.24
2
1159
1159
1158½
1159½
1204¾
1205½
+6
DCF
DMD
19.25
2
pass
1203
pass
1209
+6
21.45
2
pass
1205
pass
1211
+6
22.79
2
1207
1208
1207
1208
1213
1214
+6
23.46
pass
1209½
pass
1215¼
+5
25.72
2
pass
1212
pass
1217¾
+5
28.39
2
1215
1216
1215
1216
1220½
1221
+5
33.54
2
1222
1223
1222
1223
1227
1227¾
+4
34.57
2
pass
1224½
pass
1229½
+4
36.36
2
pass
1226½
pass
1232
+5
38.69
2
1230
1230
1234¼
+4