1U08 0838 London Bridge to Maidstone East
Departing on 9th January 2026

operated by
Southeastern

This service is partially cancelled

This service was cancelled between London Charing Cross and London Bridge due to a points failure (IB).

This service is cancelled.

This service was cancelled due to a points failure (IB).

GBTT
WTT
RTTRealtime
Route
Mi.Ch
Location
Pl
Arr
Dep
Arr
Dep
Arr
Dep
Dly
Path
Line
0.00
London Charing Cross [CHX]
Pathed as Electric multiple unit at 100mph
0828
0828
-
0.61
0831
0831
0830½
0831½
-
1.23
pass
0833½
-
1.31
pass
0834
-
1.69
2
0836
0838
0836
0838
0906¾
+28
1
2.17
pass
0839
pass
0907½
+28
2.42
pass
0839
pass
0908¼
+29
2.71
pass
0839½
pass
0908½
+29
3.32
pass
0840
pass
0909
+29
DKF
4.68
C
pass
0843
pass
0911½
+28
1
DS
5.29
pass
0844
pass
0912½
+28
5.47
2
pass
0844
pass
0913
+29
6.36
pass
0845
pass
0918
+33
DS
DF
7.16
2
pass
0846½
pass
0920
+33
FL
7.44
pass
0847
pass
0920
+33
8.78
5
pass
0849
pass
0924¾
+35
FL
SL
10.21
4
pass
0850½
pass
0926½
+36
11.19
4
pass
0851½
pass
0927½
+36
DS
RCL
12.10
pass
0853
pass
0928¾
+35
RCL
DCS
13.50
4
pass
0855
pass
0930½
+35
16.24
4
0859
0859
0858½
0859½
pass
0933½
+34
DCS
DMD
19.25
2
pass
0903
pass
0937½
+34
21.45
2
pass
0905
pass
0939¾
+34
22.79
2
0907
0908
0907
0908
pass
0942
+34
23.46
pass
0909½
pass
0943¼
+33
25.72
2
pass
0912
pass
0946¼
+34
28.39
2
0915
0916
0915
0916
pass
0949¼
+33
33.54
2
0922
0923
0922
0923
0957
0958¼
+35
34.57
2
pass
0925½
pass
1000¼
+35
36.36
2
pass
0928½
pass
1003¼
+35
38.69
3
0933
0933
1007¼
+34
DMD