5J75 2242 Wimbledon Park Depot Sdgs to London Waterloo
Departing on 29th December 2025

operated by
South Western Railway
Arterio (10 coaches)
701025
WTT
RTTRealtime
Route
Mi.Ch
Location
Pl
Arr
Dep
Arr
Dep
Dly
Path
Line
0.00
Wimbledon Park Depot Sdgs
Pathed as Electric multiple unit at 75mph
2242
2247
+5
DR
0.00
2307
2307
N/R
2318
+11
UF
0.58
2
pass
2308½
pass
2321½
+12
2.30
10
pass
2311½
pass
2323½
+12
US
UMS
2.78
pass
2312½
pass
2324
+11
3.54
pass
2313
pass
2324¾
+11
4.26
pass
2314
pass
2325½
+11
4.75
7
pass
2315
pass
2326½
+11
5.64
pass
2316
pass
2327¾
+11
6.24
3
2318
2330
+12
UMS