5J75 2242 Wimbledon Park Depot Sdgs to London Waterloo
Departing on 30th December 2025

operated by
South Western Railway
Arterio (10 coaches)
701042
WTT
RTTRealtime
Route
Mi.Ch
Location
Pl
Arr
Dep
Arr
Dep
Dly
Path
Line
0.00
Wimbledon Park Depot Sdgs
Pathed as Electric multiple unit at 75mph
2242
2242
DR
0.00
2307
2307
N/R
2313
+6
UF
0.58
2
pass
2308½
pass
2317½
+8
2.30
10
pass
2311½
pass
2319½
+8
US
UMS
2.78
pass
2312½
pass
2320¼
+8
3.54
pass
2313
pass
2321
+7
4.26
pass
2314
pass
2321¾
+7
4.75
7
pass
2315
pass
2323
+8
5.64
pass
2316
pass
2325¾
+9
6.24
3
2318
2327¾
+9
UMS