9R52 1928 Three Bridges to London Bridge
Departing on 4th January 2026

operated by
Thameslink

This service is cancelled.

This service was cancelled due to a points failure (IB).

GBTT
WTT
RTTRealtime
Route
Mi.Ch
Location
Pl
Arr
Dep
Arr
Dep
Arr
Dep
Dly
Path
Line
0.00
1928
1928
-
1.67
pass
1931
-
2.54
1933
1934
1932½
1934½
-
3.41
1937
1937
1936½
1937
-
5.64
pass
1939½
-
9.51
1944
1945
1944
1945
-
11.32
1949
1949
1948½
1949
-
15.08
1954
1954
1953½
1954
-
16.07
pass
1955½
-
16.78
1957
2000
1957
2000
-
17.73
pass
2001½
-
19.06
pass
2003
-
19.79
2005
2005
2004½
2005½
-
20.38
pass
2006½
-
21.02
pass
2007½
-
21.52
2009
2010
2009
2010
-
22.60
pass
2011½
-
23.12
pass
2012
-
23.75
pass
2013
-
24.57
pass
2013½
-
25.48
pass
2014½
-
26.51
pass
2015½
-
27.37
pass
2016
-
28.60
pass
2018
-
29.21
pass
2019
-
29.50
pass
2019½
-
30.23
2021
2021
-