0835 London Bridge to Haywards HeathDeparting on 4th January 2026
operated by
Thameslink
This service is partially cancelled
This service was cancelled between Haywards Heath and Brighton due to a problem with the train (M8).
Planned
Realtime
Location
Pl
Arr
Dep
Arr
Dep
Dly