5R08 0519 Stourbridge Jn Depot to Birmingham Moor Street
Departing on 17th December 2025

operated by
Chiltern Railways
5 coaches
WTT
RTTRealtime
Route
Mi.Ch
Location
Pl
Arr
Dep
Arr
Dep
Dly
Path
Line
0.00
Stourbridge Jn Depot
Pathed as Diesel locomotive, trailing load 68 tonnes at 100mph
0519
0520¾
+1
0.26
pass
0520
pass
0522¾
+2
DK
USB
1.18
2
pass
0522
pass
0525
+2
2.43
1
pass
0525
pass
0526¾
+1
4.03
1
pass
0528½
pass
0528¼
5.19
1
pass
0531
pass
0529¾
-1
6.67
2
pass
0533½
pass
0531½
-1
8.01
pass
0535
pass
0533¼
-1
USB
USH
8.12
2
pass
0535½
pass
0533½
-1
8.72
2
pass
0536
pass
0534¾
-1
9.48
pass
0537
pass
0536
11.19
2
pass
0538½
pass
0537¾
11.67
3
pass
0541
pass
0540
USH