2Y20 1309 Caerphilly to Barry Island
Departing on 30th November 2025

operated by
Transport for Wales
4 coaches
231011
GBTT
WTT
RTTRealtime
Route
Mi.Ch
Location
Pl
Arr
Dep
Arr
Dep
Arr
Dep
Dly
Path
Line
0.00
Caerphilly [CPH]
Pathed as Class 150/153/155/156 DMU at 75mph
1
1309
1309
1308¾
2.56
2
1313
1313
1313
1313½
1313¼
1313¾
3.40
2
1315
1316
1315
1316
1315¾
1316¼
4.49
2
1318
1318
1318
1318½
1318½
1320
+1
4.72
pass
1319½
pass
1320¾
+1
7.11
3
1324
1324
1323
1324½
1323½
1325
DR
DL
7.67
pass
1326½
pass
1326
8.12
8
1328
1329
1327
1329
1327¾
1329
DL
DB
8.38
pass
1330½
No report
8.53
pass
1331
pass
1331¼
8.75
pass
1331½
pass
1331¾
9.21
2
1333
1333
1332½
1333
1332¾
1333½
10.57
pass
1335½
pass
1336¼
10.69
2
1336
1337
1336
1337
1336¾
1337½
11.68
2
1339
1340
1339
1340
1340
1340½
12.46
2
1342
1342
1341½
1342½
1342¼
1342½
14.38
2
1346
1347
1346
1347
1345¾
1347¼
15.26
2
1349
1350
1349
1350
1349¼
1350
16.40
3
1354
1355
1353½
1355½
1353¼
1355¼
DB
UDB
17.18
1
1401
1359
1358½
UDB