9S48 1716 Brighton to LetchworthDeparting on 14th December 2025
operated by
Thameslink
This service is partially cancelled
This service was cancelled between Letchworth and Cambridge due to the train operator's request (TB).
GBTT
WTT
Realtime
Route
Mi.Ch
Location
Pl
Arr
Dep
Arr
Dep
Arr
Dep
Dly
Path
Line