6E97 1049 New Biggin Flhh to South Bank Tees Dock (Fhh)
Departing on 16th December 2025

This train runs as required

This service runs on an as required basis, and it has not yet been activated in the railway computer systems. This alert will disappear if the train is activated.

If the service should have departed by now, this normally means it is not running. If the train is set to run in the future, then check again closer to the time.

WTT
Route
Location
Pl
Arr
Dep
Path
Line
pass
1059
pass
1101
pass
1105½
pass
1115
pass
1120½
pass
1127
pass
1132½
pass
1141½
pass
1146
pass
1148
Hellifield Goods Loops
Service stops for pathing (passing train)
1153½
1219½
1
pass
1227
2
pass
1233
1
pass
1245½
pass
1256½
1
pass
1258
pass
1258½
pass
1259
pass
1303
Kirkstall Up Loop
1
Service stops for pathing (passing train)
1311
1341½
pass
1347½
US
Whitehall Jn
Service stops for pathing (passing train)
1349½
1352
UWC
Eng Shed &Holbeck Depot Jn [XES]
Service stops for pathing (passing train)
1355
1404
pass
1409
pass
1414½
pass
1417½
1
pass
1422
Milford Jn.
Service stops for staffing reasons
1435
1438
pass
1441
2
pass
1444
NNL
pass
1446½
pass
1451
NNL
5
pass
1457
pass
1511
SL
pass
1517
2
pass
1524
SL
pass
1531
pass
1544½
pass
1547
pass
1552½
pass
1553½
DG
pass
1556½
GL
Tees Yard Dn Stagings Fh
Service stops for pathing (passing train), stops for staffing reasons
1600½
1632
pass
1637
SL
2
pass
1641½
SL
SL
pass
1649
GL
pass
1651½