6F61 2005 Mountsorrel Sdgs to Arpley Sidings
Departing on 3rd December 2025

This train runs as required

This service runs on an as required basis, and it has not yet been activated in the railway computer systems. This alert will disappear if the train is activated.

If the service should have departed by now, this normally means it is not running. If the train is set to run in the future, then check again closer to the time.

WTT
Route
Mi.Ch
Location
Pl
Arr
Dep
Path
Line
0.00
2005
FL
0.52
pass
2006½
3.51
1
pass
2011½
FL
4.06
pass
2014½
SL
8.30
pass
2022
10.34
pass
2025½
SL
SL
11.16
pass
2027½
HL
12.51
pass
2032
13.26
pass
2034
HL
GL
13.64
Toton Centre Jn
Service stops for pathing (passing train), stops for staffing reasons
2037
2049½
HLG
14.43
pass
2054½
ML
17.12
pass
2059½
17.63
pass
2100½
18.51
pass
2102
21.68
1
pass
2108
24.76
pass
2114
25.18
pass
2114½
28.07
pass
2120½
31.09
pass
2125½
34.77
pass
2131½
EL
36.15
pass
2133
37.21
pass
2134
ML
38.20
1
pass
2135
ML
38.64
pass
2136
43.44
pass
2143
45.71
pass
2146½
46.14
pass
2147½
46.60
pass
2149
50.68
1
pass
2155½
52.58
pass
2157½
54.40
1
pass
2159½
57.18
DGL
pass
2203
61.12
1
pass
2212
65.50
pass
2219
65.79
pass
2219½
67.00
pass
2221½
69.57
pass
2226½
75.00
DCL
pass
2235
81.46
pass
2249
85.05
pass
2259
85.40
pass
2300½
86.24
pass
2303
86.61
pass
2304½
88.35
pass
2307
90.21
pass
2309½
92.70
pass
2313½
95.47
pass
2317
96.37
pass
2318½
98.27
pass
2321½
98.79
pass
2322½
99.24
pass
2323
100.17
pass
2325½
100.58
pass
2326½
101.41
pass
2329
102.17
pass
2332
SL
103.79
Acton Bridge [ACB]
Service stops for pathing (passing train)
2336½
2356
FL
106.14
pass
0001
111.65
pass
0005½
OL
112.71
pass
0008½
113.01
LHS
0012