6A20 0139 Whatley Quarry F Liner Hh to W. Drayton Hanson Agg Flhh
Departing on 6th December 2025

This train runs as required

This service runs on an as required basis, and it has not yet been activated in the railway computer systems. This alert will disappear if the train is activated.

If the service should have departed by now, this normally means it is not running. If the train is set to run in the future, then check again closer to the time.

WTT
Route
Location
Pl
Arr
Dep
Path
Line
pass
0157
UF
pass
0205
3
pass
0207½
pass
0219
pass
0235
pass
0240½
pass
0248
2
pass
0253½
pass
0259½
Theale Loop
1
Service stops for pathing (passing train)
0323
0440
pass
0448
pass
0449½
UFM
11
pass
0451½
UML
pass
0457
2
pass
0458
ML
pass
0459½
2
pass
0505
ML
pass
0505½
pass
0507
pass
0508½
pass
0510½
5
pass
0511
RL
pass
0512½
pass
0516
GL
Up Iver Loop
Pathed as Diesel locomotive, trailing load 1800 tonnes from here
Service divides here
0523
0543
UDG
Dawley Loop
Service reverses here
0550
0552