6D09 0917 Hull Coal Terminal (Gbrf) to Ferrybridge Ps Gypsum Gbrf
Departing on 4th December 2025

WTT
RTTRealtime
Route
Mi.Ch
Location
Pl
Arr
Dep
Arr
Dep
Dly
Path
Line
0.00
Hull Coal Terminal (Gbrf)
Pathed as Diesel locomotive, trailing load 1800 tonnes at 60mph
0917
0916
-1
0.40
pass
0932
No report
1.01
0937
0941
No report
2.59
pass
0953
No report
6.36
pass
1004½
No report
6.77
pass
1006½
No report
7.74
pass
1010
No report
9.20
pass
1013½
No report
10.64
1
pass
1015½
pass
1016¾
+1
13.42
pass
1019
pass
1020
+1
16.38
2
pass
1022½
pass
1023¼
20.36
2
pass
1027½
pass
1027
22.76
2
pass
1030½
pass
1030¼
UH
USM
26.54
2
pass
1038
pass
1035¼
-2
29.53
2
pass
1044
pass
1043
-1
30.12
pass
1046
No report
30.76
pass
1047½
No report
33.53
pass
1052
No report
36.35
1057
1057½
No report
38.62
pass
1104½
pass
1104½
UGO
40.07
1
pass
1107
pass
1107
41.46
pass
1109
pass
1108½
41.73
1
pass
1109½
pass
1109½
43.40
pass
1111½
pass
1111
UG
45.58
pass
1116
pass
1114¾
-1
46.11
1
pass
1119
pass
1118¾
46.28
pass
1120½
pass
1119¾
UGO
DK
46.72
pass
1124
pass
1120¾
-3
DK
DPT