5D05 0520 Wimbledon Park Depot Sdgs to London Waterloo
Departing on 1st December 2025

operated by
South Western Railway
Arterio (10 coaches)
701017
WTT
RTTRealtime
Route
Mi.Ch
Location
Pl
Arr
Dep
Arr
Dep
Dly
Path
Line
0.00
Wimbledon Park Depot Sdgs
Pathed as Electric multiple unit at 75mph
0520
0520
EFD
0.00
0525
0525
N/R
0521
-4
UF
0.58
pass
0526½
pass
0524¾
-1
2.30
8
pass
0529½
pass
0529½
UF
UMF
2.78
pass
0531
pass
0532¾
+1
3.54
pass
0533
pass
0533½
4.26
pass
0534½
pass
0534
4.75
5
pass
0536
pass
0535½
MSL
5.64
pass
0537½
pass
0537½
UMF
UMR
6.24
8
0543
0539¾
-3
UMR