2H27 1142 London Waterloo to Shepperton
Departing on 1st December 2025

operated by
South Western Railway
Arterio (10 coaches)
701021
GBTT
WTT
RTTRealtime
Route
Mi.Ch
Location
Pl
Arr
Dep
Arr
Dep
Arr
Dep
Dly
Path
Line
0.00
London Waterloo [WAT]
Pathed as Electric multiple unit at 75mph
5
1142
1142
1147
+5
DMS
0.40
pass
1143½
pass
1148½
+5
1.29
8
1145
1146
1145
1146
1150¼
1151¼
+5
1.78
pass
1147
pass
1152½
+5
2.50
pass
1148
pass
1153
+5
3.26
pass
1149
pass
1153¾
+4
3.74
11
1150
1151
1150
1151
1155½
1155½
+4
DMS
DS
5.46
3
pass
1153½
pass
1157¾
+4
7.19
8
1156
1157
1156
1157
1200¾
1201¾
+4
7.49
pass
1158
pass
1202½
+4
8.51
3
1200
1200
1159½
1200
1204¼
1204¾
+4
9.62
4
1202
1202
1202
1202½
1207
1207¾
+5
DS
DK
11.24
2
1206
1206
1205½
1206½
1211
1211¾
+5
12.09
2
1209
1209
1208½
1209½
1213½
1214½
+5
DK
12.44
2
1211
1211
1211
1211½
1215¾
1216½
+5
13.54
1
1214
1214
1213½
1214½
1218½
1219¼
+4
14.29
pass
1216½
pass
1220¾
+4
DK
DS
14.53
pass
1218
pass
1221½
+3
14.72
2
1220
1220
1219½
1220
1222½
1223¼
+3
16.44
2
1223
1224
1223
1224
1226½
1227½
+3
18.25
2
pass
1226½
pass
1230¾
+4
18.61
2
1228
1228
1227½
1228
1231¼
1232
+4
19.31
2
1230
1230
1229½
1230
1233½
1234½
+4
20.70
1
1235
1233
1237¼
+4
DS