2H27 1142 London Waterloo to Shepperton
Departing on 4th December 2025

operated by
South Western Railway
Arterio (10 coaches)
701035
GBTT
WTT
RTTRealtime
Route
Mi.Ch
Location
Pl
Arr
Dep
Arr
Dep
Arr
Dep
Dly
Path
Line
0.00
London Waterloo [WAT]
Pathed as Electric multiple unit at 75mph
6
1142
1142
1141½
DMS
0.40
pass
1143½
pass
1143½
1.29
8
1145
1146
1145
1146
1145¼
1146¼
1.78
pass
1147
pass
1147¾
2.50
pass
1148
pass
1148½
3.26
pass
1149
pass
1149
3.74
11
1150
1151
1150
1151
1150¾
1151¼
DMS
DS
5.46
3
pass
1153½
pass
1153½
7.19
8
1156
1157
1156
1157
1157
1157¾
7.49
pass
1158
pass
1158¾
+1
8.51
3
1200
1200
1159½
1200
1201
1201¾
+1
9.62
4
1202
1202
1202
1202½
1204
1204¾
+2
DS
DK
11.24
2
1206
1206
1205½
1206½
1208¼
1209
+2
12.09
2
1209
1209
1208½
1209½
1210¾
1211¾
+2
DK
12.44
2
1211
1211
1211
1211½
1213
1214
+2
13.54
1
1214
1214
1213½
1214½
1216½
1217½
+3
14.29
pass
1216½
pass
1218¾
+2
DK
DS
14.53
pass
1218
pass
1219¾
+2
14.72
2
1220
1220
1219½
1220
1220¾
1221¾
+1
16.44
2
1223
1224
1223
1224
1225
1226
+2
18.25
2
pass
1226½
pass
1229
+2
18.61
2
1228
1228
1227½
1228
1229¾
1230½
+2
19.31
2
1230
1230
1229½
1230
1231¾
1233¼
+3
20.70
1
1235
1233
1236
+3
DS