2H61 2012 London Waterloo to Shepperton
Departing on 3rd December 2025

operated by
South Western Railway
Arterio (10 coaches)
701035
GBTT
WTT
RTTRealtime
Route
Mi.Ch
Location
Pl
Arr
Dep
Arr
Dep
Arr
Dep
Dly
Path
Line
0.00
London Waterloo [WAT]
Pathed as Electric multiple unit at 75mph
5
2012
2012
2015¼
+3
DMS
0.40
pass
2013½
pass
2017
+3
1.29
8
2015
2016
2015
2016
2018¾
2020
+4
1.78
pass
2017
pass
2021¼
+4
2.50
pass
2018
pass
2022
+4
3.26
pass
2019
pass
2022½
+3
3.74
11
2020
2021
2020
2021
2024¼
2024½
+3
DMS
DS
5.46
3
pass
2024
pass
2027¼
+3
7.19
8
2028
2029
2027½
2029
2032½
2033½
+4
7.49
pass
2030
pass
2034½
+4
8.51
3
2032
2032
2031½
2032
2037
2037¾
+5
9.62
4
2034
2034
2034
2034½
2040
2040¾
+6
DS
DK
11.24
2
2038
2038
2037½
2038½
2043½
2044¼
+5
12.09
2
2041
2041
2040½
2041½
2046
2046¾
+5
DK
12.44
2
2043
2043
2043
2043½
2048
2048¾
+5
13.54
1
2046
2046
2045½
2046½
2050¾
2051¾
+5
14.29
pass
2048½
pass
2053
+4
DK
DS
14.53
pass
2049½
pass
2054¼
+4
14.72
2
2051
2051
2050½
2051
2055¼
2056
+5
16.44
2
2054
2055
2054
2055
2058¾
2059½
+4
18.25
2
2058
2058
2058
2058½
2102¼
2103
+4
18.61
2
2100
2100
2059½
2100
2104¼
2105
+5
19.31
2
pass
2101½
pass
2106¼
+4
20.70
1
2106
2104
2109
+5
DS