2H66 2011 Shepperton to London Waterloo
Departing on 7th December 2025

operated by
South Western Railway
Arterio (10 coaches)
701009
GBTT
WTT
RTTRealtime
Route
Mi.Ch
Location
Pl
Arr
Dep
Arr
Dep
Arr
Dep
Dly
Path
Line
0.00
Shepperton [SHP]
Pathed as Electric multiple unit at 75mph
1
2011
2011
2010¾
US
1.39
1
2014
2014
2014
2014½
2013¾
2014¼
2.09
1
2016
2016
2016
2016½
2015¾
2016½
2.45
1
2018
2018
2017½
2018
2017¾
2018
4.26
1
2021
2021
2021
2021½
2021
2021
5.78
1
2024
2024
2024
2024½
2024¼
2024¾
6.17
pass
2026
pass
2025¼
6.41
pass
2027
pass
2026¼
US
UK
7.16
2
2029
2029
2028½
2029
2028
2028¾
8.26
1
2031
2031
2031
2031½
2030¾
2031½
8.61
3
2033
2034
2033
2034½
2032¾
2033½
9.46
1
2036
2036
2036
2036½
2035¼
2036
11.08
1
2040
2040
2040
2040½
2039
2039½
UK
US
12.19
2
2043
2043
2042½
2043
2041½
2042¼
13.21
pass
2045
pass
2043¾
13.51
5
2046
2047
2046
2047
2044¾
2045¾
-1
US
14.42
pass
2048½
pass
2047¼
-1
15.24
2
2050
2050
2050
2050½
2049
2049¾
16.76
10
2054
2054
2053½
2054½
2052¼
2053¼
-1
US
UMS
17.44
pass
2055½
pass
2054½
-1
18.20
pass
2056½
pass
2055½
-1
18.72
pass
2057½
pass
2056¼
19.41
7
2059
2059
2058½
2059½
2057¾
2058½
20.30
pass
2101½
pass
2100
-1
20.70
3
2106
2104
2102¼
-1
UMS