2S09 0622 London Waterloo to Weybridge
Departing on 13th December 2025

operated by
South Western Railway
8 coaches
458416
458420
GBTT
WTT
RTTRealtime
Route
Mi.Ch
Location
Pl
Arr
Dep
Arr
Dep
Arr
Dep
Dly
Path
Line
0.00
London Waterloo [WAT]
Pathed as Electric multiple unit at 100mph
19
0622
0622
0621¾
WR
0.40
pass
0623½
pass
0623½
WR
DWS
1.29
4
0626
0626
0625½
0626½
0626
0626¾
1.78
pass
0628
pass
0628¼
DWS
DW
2.50
3
0629
0629
0629
0629½
0629½
0630
DW
DWF
3.17
pass
0630½
pass
0631
3.74
5
0632
0632
0631½
0632½
0632¾
0633¼
4.60
2
0635
0635
0634½
0635
0635¼
0635¾
5.72
3
0637
0638
0637
0638
0638¼
0639
+1
7.07
3
0641
0642
0640½
0642½
0641¼
0642
DWF
DH
7.54
2
0644
0644
0644
0644½
0643¾
0644¼
8.47
2
0647
0647
0646½
0647½
0646½
0647
9.34
pass
0649
pass
0648¾
9.53
2
0650
0650
0649½
0650
0649¼
0650
10.01
pass
0651
pass
0650½
10.52
2
0652
0653
0652
0653
0652¼
0653
11.34
2
0655
0655
0654½
0655
0654¾
0655½
12.10
2
0657
0657
0656½
0657
0657
0658
+1
13.40
2
0700
0702
0659½
0702
0700¼
0701¾
14.19
pass
0703½
pass
0703
14.48
pass
0704½
pass
0703¾
DH
DT
16.01
2
0708
0708
0707½
0708½
0706¾
0707¾
18.53
2
0712
0712
0712
0712½
0711½
0712¼
20.15
2
0716
0716
0715½
0716½
0715
0716
22.15
2
0721
0721
0720½
0721
0720½
0721¼
24.28
4
0725
0725
0725
0725½
0725½
0726¼
DT
DC
26.68
1
0730
0731
0730
0731
0731½
0732½
+1
28.22
1
0734
0734
0733½
0734
0735
0736
+2
29.25
pass
0735½
pass
0737¾
+2
30.05
Approaching
Weybridge [WYB]
1
0738
0738
0740¼
+2
DC