2S21 0922 London Waterloo to Weybridge
Departing on 12th December 2025

operated by
South Western Railway
8 coaches
458427
458424
GBTT
WTT
RTTRealtime
Route
Mi.Ch
Location
Pl
Arr
Dep
Arr
Dep
Arr
Dep
Dly
Path
Line
0.00
London Waterloo [WAT]
Pathed as Electric multiple unit at 100mph
23
0922
0922
0922
WR1
0.40
pass
0923½
pass
0923¼
WR1
DWF
1.29
3
0926
0926
0925½
0927½
0925½
0926¼
-1
1.78
pass
0929
pass
0927½
-1
DWF
DW
2.50
3
0929
0929
0930
0930½
0928¾
0929½
DW
DWF
3.17
pass
0931½
pass
0930½
3.74
5
0932
0932
0932½
0933½
0932
0932½
4.60
2
0935
0935
0935½
0936
0934½
0935¼
5.72
3
0937
0938
0938
0939
0937½
0938½
7.07
3
0942
0942
0941½
0942½
0940¾
0942
DWF
DH
7.54
2
0944
0944
0944
0944½
0943¾
0944½
8.47
2
0947
0947
0946½
0947½
0946½
0947¼
9.34
pass
0949
pass
0949
9.53
2
0950
0950
0949½
0950
0949½
0950¼
10.01
pass
0951
pass
0950¾
10.52
2
0952
0953
0952
0953
0952½
0953
11.34
2
0955
0955
0954½
0955
0954¾
0955¾
12.10
2
0957
0957
0956½
0957
0957¼
0958
+1
13.40
2
1000
1002
0959½
1002
1000½
1001¾
14.19
pass
1003½
pass
1003
14.48
pass
1004½
pass
1003¾
DH
DT
16.01
2
1008
1008
1007½
1008½
1006½
1007½
18.53
2
1012
1012
1012
1012½
1011¼
1012
20.15
2
1016
1016
1015½
1016½
1014¾
1015¾
22.15
2
1021
1021
1020½
1021
1020
1021
24.28
4
1025
1025
1025
1025½
1025½
1026
DT
DC
26.68
1
1030
1031
1030
1031
1031
1031¾
28.22
1
1034
1034
1033½
1034
1034½
1035½
+1
29.25
pass
1035½
pass
1037
+1
30.05
Approaching
Weybridge [WYB]
1
1038
1038
1039¾
+1
DC