2S33 1222 London Waterloo to Weybridge
Departing on 29th November 2025

operated by
South Western Railway
8 coaches
458428
458411
GBTT
WTT
RTTRealtime
Route
Mi.Ch
Location
Pl
Arr
Dep
Arr
Dep
Arr
Dep
Dly
Path
Line
0.00
London Waterloo [WAT]
Pathed as Electric multiple unit at 100mph
19
1222
1222
1221¾
UW
0.40
pass
1223½
pass
1223¼
UW
DWF
1.29
3
1226
1226
1225½
1226½
1225½
1226½
1.78
pass
1228
pass
1227½
DWF
DW
2.50
3
1229
1229
1229
1229½
1229
1229¾
DW
DWF
3.17
pass
1230½
pass
1230¾
3.74
5
1232
1232
1231½
1232½
1232¼
1233¼
4.60
2
1235
1235
1234½
1235
1235
1236¼
+1
5.72
3
1237
1238
1237
1238
1238½
1239½
+1
7.07
3
1241
1242
1240½
1242½
1242
1242¾
DWF
DH
7.54
2
1244
1244
1244
1244½
1244½
1245¼
8.47
2
1247
1247
1246½
1247½
1247½
1248½
+1
9.34
pass
1249
pass
1250
+1
9.53
2
1250
1250
1249½
1250
1250½
1252½
+2
10.01
pass
1251
pass
1253
+2
10.52
2
1252
1253
1252
1253
1254½
1256¼
+3
11.34
2
1255
1255
1254½
1255
1257¾
1258½
+3
12.10
2
1257
1257
1256½
1257
1300¼
1301
+4
13.40
2
1300
1302
1259½
1302
1303¼
1304
+2
14.19
pass
1303½
pass
1305¼
+1
14.48
pass
1304½
pass
1306
+1
DH
DT
16.01
2
1308
1308
1307½
1308½
1308¾
1309½
+1
18.53
2
1312
1312
1312
1312½
1313
1313½
+1
20.15
2
1316
1316
1315½
1316½
1316
1316¾
22.15
2
1321
1321
1320½
1321
1321
1321¾
24.28
4
1325
1325
1325
1325½
1325½
1326
DT
DC
26.68
1
1330
1331
1330
1331
1330¼
1331¼
28.22
1
1334
1334
1333½
1334
1333¾
1334½
29.25
pass
1335½
pass
1336¼
30.05
Approaching
Weybridge [WYB]
1
1338
1338
1338¾
DC