2S71 2152½ London Waterloo to Weybridge
Departing on 1st December 2025

operated by
South Western Railway
8 coaches
458424
458427
GBTT
WTT
RTTRealtime
Route
Mi.Ch
Location
Pl
Arr
Dep
Arr
Dep
Arr
Dep
Dly
Path
Line
0.00
London Waterloo [WAT]
Pathed as Electric multiple unit at 100mph
20
2152
2152½
2152
WR1
0.40
pass
2154
pass
2152¾
-1
WR1
DWF
1.29
3
2156
2157
2156
2157
2155
2156¾
1.78
pass
2158½
pass
2158
DWF
DW
2.50
3
2200
2200
2159½
2200
2159¼
2200
DW
DWS
3.17
pass
2201
pass
2201
3.74
6
2202
2203
2202
2203
2202½
2203
DWS
DWS
4.60
1
2205
2205
2205
2205½
2205
2205¾
5.72
4
2208
2208
2207½
2208½
2208¼
2209
7.07
4
2211
2213
2211
2213
2211½
2212¾
DWS
DH
7.54
2
2215
2215
2214½
2215
2214¼
2215
8.47
2
2217
2218
2217
2218
2217
2217¾
9.34
pass
2219½
pass
2219¼
9.53
2
2220
2220
2220
2220½
2219¾
2220½
10.01
pass
2221½
pass
2221
10.52
2
2223
2223
2222½
2223½
2222½
2223¼
11.34
2
2225
2225
2225
2225½
2225
2225¾
12.10
2
2227
2227
2227
2227½
2227¼
2228½
+1
13.40
2
2230
2232
2230
2232½
2230¾
2231¾
14.19
pass
2234
pass
2233
14.48
pass
2235
pass
2233¾
-1
DH
DT
16.01
2
2238
2238
2237½
2238½
2236¾
2237¾
18.53
2
2242
2242
2242
2242½
2241½
2242
20.15
2
2246
2246
2245½
2246½
2245¼
2246
22.15
2
2251
2251
2250½
2251
2250
2250¾
24.28
4
2255
2255
2255
2255½
2255
2255½
DT
DC
26.68
1
2300
2301
2300
2301
2300½
2301¼
28.22
1
2304
2304
2303½
2304
2303¾
2304½
29.25
pass
2305½
pass
2306½
+1
30.05
Approaching
Weybridge [WYB]
1
2308
2308
2309½
+1
DC