2U37 1333 London Waterloo to Windsor & Eton Riverside
Departing on 8th December 2025

operated by
South Western Railway
8 coaches
458412
458411
GBTT
WTT
RTTRealtime
Route
Mi.Ch
Location
Pl
Arr
Dep
Arr
Dep
Arr
Dep
Dly
Path
Line
0.00
London Waterloo [WAT]
Pathed as Electric multiple unit at 100mph
20
1333
1333
1333
WR1
0.40
pass
1334½
pass
1339
+4
WR1
DWF
1.29
3
1337
1337
1336½
1337½
1341
1342
+4
1.78
pass
1339
pass
1343
+4
DWF
DW
2.50
3
pass
1340
pass
1344
+4
DW
DWS
3.17
pass
1340½
pass
1344½
+3
3.74
6
1342
1343
1342
1343
1346
1346¾
+3
DWS
DWS
4.60
1
pass
1344½
pass
1348½
+4
5.72
4
1346
1347
1346
1347
1350
1350¾
+3
7.07
4
pass
1349
pass
1353
+4
DWS
DR
8.21
2
pass
1350
pass
1354¼
+4
9.03
2
pass
1351
pass
1355
+4
9.57
1
1352
1353
1352
1353
1356
1357¼
+4
DR
DT
10.66
3
pass
1355
pass
1359
+4
11.22
5
1356
1357
1356
1357
1400
1401
+4
11.49
pass
1358
pass
1401¾
+3
12.43
2
1400
1400
1359½
1400
1403¼
1404
+4
13.03
pass
1401
pass
1405¼
+4
13.35
pass
1401½
pass
1405½
+4
14.68
2
1404
1404
1403½
1404½
1407¾
1409½
+5
17.40
2
1408
1408
1408
1408½
1413
1414
+5
19.02
2
1411
1412
1411½
1412½
1416½
1417¾
+5
DT
DW
21.40
2
1416
1417
1416
1417
1421
1422
+5
22.48
2
1419
1420
1419
1420
1424
N/R
+5
23.63
2
1423
1424
1422½
1424
N/R
1428
+4
25.48
2
1429
1429
1432
+3