2U67 2044 London Waterloo to Windsor & Eton Riverside
Departing on 30th November 2025

operated by
South Western Railway
Arterio (10 coaches)
701018
GBTT
WTT
RTTRealtime
Route
Mi.Ch
Location
Pl
Arr
Dep
Arr
Dep
Arr
Dep
Dly
Path
Line
0.00
London Waterloo [WAT]
Pathed as Electric multiple unit at 100mph
20
2044
2044
2052¼
+8
WR1
0.40
pass
2045½
pass
2053¼
+7
WR1
DWF
1.29
3
2048
2048
2047½
2048½
2056¼
2057¼
+8
1.78
pass
2050
pass
2058½
+8
DWF
DW
2.50
3
2051
2051
2051
2051½
2100¼
2101
+9
DW
DWF
3.17
pass
2052½
pass
2102
+9
3.74
5
2054
2054
2053½
2054½
2104
2104¾
+10
4.60
2
2057
2057
2056½
2057
2106¾
2107½
+10
5.72
3
2059
2100
2059
2100
2110¼
2111½
+11
DF
7.07
3
2103
2103
2102½
2103
2114½
2115
+12
DWF
DR
8.21
2
2105
2105
2105
2105½
2117¼
2118
+12
9.03
2
2107
2107
2107
2107½
2119½
2121
+13
9.57
1
2109
2110
2109
2110
2122½
2123¼
+13
DR
DT
10.66
3
2112
2112
2112
2112½
2125½
2126½
+14
11.22
5
2114
2115
2114
2115
2127¾
2141½
+26
11.49
pass
2116
pass
2142¼
+26
12.43
2
2118
2118
2117½
2118
2144½
2156
+38
13.03
pass
2119
pass
2157
+38
13.35
pass
2119½
pass
2157¼
+37
14.68
2
2122
2122
2121½
2122½
2200¾
2201¾
+39
17.40
2
2126
2126
2126
2126½
2205½
2206¼
+39
19.02
2
2130
2130
2129½
2130½
2208¾
2209¾
+39
DT
DW
21.40
2
2134
2135
2134
2135
2213
2214
+39
22.48
2
2137
2138
2137
2138
2216
N/R
+39
23.63
2
2141
2142
2140½
2142
N/R
2219
+37
25.48
2
2147
2147
2224
+37